Project 6 : Integrated Project : Design and Build An Amphitheatre Stage

Assalamualaikum

We had to work in a group of 16 student from 7 different major : architecture, urban and regional  planning, interior design, construction management, building surveying, building technology and quantity surveying. This project we have communicate to each other even we came from different major.


GRADY AKBAR  
MUNIRAH BINTI ZAKARIA
THAN YIN JIE (Leader)
CHENG HUI YING
XU HAN
AHMAD HUSSIN BIN YASNI
MUNIFAH SYAZA BINTI ZANON ABIDIN
SIOW YUET MEI
ANGELINE LEE MAY CHIN
NUR SHAKIRIN ATIRAH BINTI IBRAHIM
MOHAMAD FAIZREEN BIN AZMAN
AMEERA BINTI MOHD NORDIN
AMINAH BINTI BALKHIS
KHOR HUI MING
NUR SAKINAH BINTI ALI

Project 6 is an integrated project to design and build a small scale building in a group of 15 to 16 students. It comprises of Project 6A, 6B, 6C and 6D. The whole project duration is 42 days from the project issued on 28th October until the final submission on 9th December 2013.

PROJECT 6A: AMPHITHEATRE STAGE DESIGN

PROJECT 6B: PROJECT REPORT

PROJECT 6C: PHYSICAL SCALE MODEL OF AMPHITHEATRE STAGE




 for the 6b,it was project report which the progress report runs for 6 weeks that consist of

discussion on the progress,problem that have been arisen,work lies ahead,schedule of work

and cost involved.and the final report consist of purpose,goal and objective,background 

study and site analysis,proposed design development,construction method,material 

selection &  basic,building services,element cost analysis(ECA),model costing estimate and 

project scheduling.












For Project 6c, based on the presentation dawings of their respective Amphiteatre Stage design, each group needs to build or construct the scale size model of their stage (1:5 scale).
Students are given two weeks to plan and complete the model construction process.
   










 